The project for this leading mobile telecommunications organisation featured the creation of a number of meeting room pods throughout the open office space over three floors.

i Wall also had extra considerations as work had to be carried out outside of normal office hours with three phases per floor.

The phased six month project required market leading acoustic performance.

At A Glance

  • i Wall Project Value: £230,000
  • Designer: Platform Group
  • Contractor: Rbiz Solutions
  • Client: Leading Mobile Communications provider
  • Project Duration: Phased over 6 months
  • Size: 90,000 sq ft

“i Wall were professional from start to finish. They listened carefully and delivered the project on time and within budget.”

We Made It Happen

Our Solution

i Wall produced working drawings for Rbiz to construct pre-determined drywall openings to enable pre manufacture of door leafs and glass. All meeting rooms and pods consisted of 47Rw dB frameless i Wall 110 double glazed complete with 40Rw dB flush double glazed door modules.

The Benefits

Vodafone found many benefits including greater acoustic performance, which greatly aided staff comfort and output. The client has been delighted with the functionality of the finished installation, and with a 70% utilisation of booking for three months in advance within weeks of installation, more Pods are planned for other floors and locations throughout the country.